Spectro provides full range of services for EIA and related consultancy with an ISO 9001-2000, and ISO 17025 certified laboratory, approved by the MoEF and various state pollution control Boards and accredited by NABL.

Spectro has a team of experienced and qualified professionals with Doctorates, M. Tech, B. Tech. and M. Sc. in the respective fields to work in the specific assignments.

Spectro serves in the following areas of Environmental Impact Assessment

bullet

Initial Environmental Examination

bullet

Post Project Compliances Monitoring and Reporting

bullet

Package for baseline primary and secondary data generation

bullet

Detailed EMP preparation

bullet

Pre-feasibility Reports for Environment

bullet

Demographic Impact Assessment

bullet

Development Impact Assessment

bullet

Ecological Impact Assessment

bullet

Environmental Auditing

bullet

Environmental Management Systems

bullet

Health Impact Assessment

bullet

Project Evaluation

bullet

Public Consultation

bullet

Public Participation

bullet

Risk Assessment

bullet

Social Impact Assessment

bullet

Strategic Impact Assessment

bullet

Technology Assessment

We have received substantial exposure of these sectors over the years-

bullet

Hydroelectric Projects

bullet

Construction Projects

bullet

CBM Projects

bullet

Oil and Gas Exploration

bullet

Oil Refinery

bullet

Roads and Bridges

bullet

Metro Rail project

The importance of environmental protection and conservation measures has been increasingly recognized during the past two decades. It is now substantially accepted that economic development strategies must be compatible with environmental goals. This requires the incorporation of environmental dimensions into the process of development.

In order to predict environmental impacts of any development activity and to provide an opportunity to militate against negative impacts and enhance positive impacts, The environmental impact assessment (EIA) procedure was developed in the 1970s by NEPA and got momentum in 1980s in almost every part of the world. The concept was rapidly adopted by India in 1990s and notification came in 1994.

Ministry of Environment and Forest brought notification and amendments time to time to improve the study and categorize the sectors and the latest notification came on 14th September 2006.

After this notification all the industrial, infrastructure, Highways, Ropeways, Waterways, Commercial and large scale Construction, SEZs, Mining, Thermal, Wind and Hydropower Projects and Developmental projects needs clearance from State authority and MoEF. That needs a detailed EIA/EMP study to provide the necessary base for the clearance from the concerned authority depending on the requirement.

The study covers broad areas of environment namely Topography, Ecology, Forest and other broad ecosystems, Socio-economic, air, water, land use, Micro-meteorology, Public liability, project appraisal, Risk Analysis/Emergency Preparedness Plan and other sector specific issues.

EIA has three main functions

bullet

to predict problems,

bullet

to find ways to avoid them, and

bullet

to enhance positive effects.

Key Elements of EIA

bullet

Project Proposal

bullet

Screening

bullet

Scoping and consideration of alternatives

bullet

Base line data collection

bullet

Impact prediction and Assessment of Alternatives

bullet

EIA Report

bullet

Public hearing

bullet

Decision-making

bullet

Monitoring the clearance conditions

Approach and Methodology

copyright ©SPECTRO, all right reserved  || disclaimer ||